Israel's electricity sector after the reform: who generates, who carries the power and who pays

About 60% of Israel's electricity now comes from private producers, and according to the Israel Electric Corporation about 447,000 of its customers have moved to private suppliers. Natural gas still fuels 72% of generation, and the Electricity Authority has frozen the handling of new and pending data-center connection requests until 7 December 2026.

By Ilan Abramov10 min read
Israel's electricity sector after the reform: who generates, who carries the power and who pays
* The cover image was generated with an AI tool and is not a photograph, and it was adapted from a cover already used for another article on the site.

In 2024 private producers generated about 60% of Israel's electricity, up from 16% in 2014. Eight years after the 2018 reform, the Israel Electric Corporation (IEC) still owns the grid, but generation and supply are now open to competition. Meanwhile official forecasts expect demand to grow, natural gas is still the main fuel, and the Electricity Authority describes a limit on how many large new consumers can be connected.

Errors or inaccuracies are possible. Spotted something that looks wrong? Write to me and I will correct it.

Why it matters

Every industry uses electricity, so any change in its cost or availability spreads through the whole economy. The reports of the Electricity Authority and of Noga, the system operator, do not give the sector's share of GDP. Three figures they do publish show its scale:

  • Consumption: According to Noga, total consumption in 2025, excluding pumped storage, was 80.4 TWh, up 0.5% on 2024. Average growth over 2023-2025 was about 2.2% a year. In 2024 alone demand rose about 4.4%, according to the Electricity Authority.
  • Gas: The power sector uses about 80% of domestic natural-gas demand.
  • Investment: The Electricity Authority has advanced and approved about NIS 90 billion of investment for 2024-2031. About NIS 47 billion goes to generation and storage (excluding IEC), about NIS 22 billion to the distribution development plan and about NIS 20 billion to the transmission development plan.

How the sector works

Until 2018, IEC was almost the entire sector. The 2018 reform split it into separate segments. Noga, a state-owned company, was set up as part of the June 2018 reform and took over system operation from IEC. The reform also sold IEC power stations to private producers. The last of them, the Eshkol station, went for about NIS 9 billion.

SegmentWho operates in itHow the price is set
GenerationIEC, private gas-fired producers, solar plants and storage facilitiesA generation component in the regulated tariff, alongside a wholesale market where the system operator sets a half-hourly price
System operationNogaBalances supply and demand in real time, forecasts demand and plans the transmission grid
TransmissionIEC, as an essential service providerA network tariff set by the Electricity Authority
DistributionIEC in most of the countryA network tariff set by the Electricity Authority
SupplyIEC and private suppliers, including "virtual" suppliers that own no plantsSuppliers compete on discounts to the regulated tariff

The Electricity Authority sets the tariff. In December 2025 it changed how the tariff is built (Decision 72806). In that decision the Authority wrote that the generation component is still calculated from average costs, as if IEC were almost the only player. As a result, private suppliers in practice price against it. Since 1 January 2026 the tariff has updated automatically twice a year, on 1 January and 1 July, according to preset indices.

The decision also set "bands" alongside the automatic updates. If the gap between costs and revenues builds up to NIS 750 million at IEC, NIS 350 million at Noga or NIS 600 million in any one segment, the Authority's plenum must hold a dedicated discussion.

◆ניטרלי

Household tariff from 1 July 2026, agorot per kWh

ComponentAgorot per kWh
Generation31.12
System (backup, reserves and balancing)9.29
Network (transmission and distribution)13.42
Total53.83

The players

Israel Electric Corporation. IEC is state-owned. On 30 June 2026 it had 10,982 employees. Its revenue in the first half of 2026 was NIS 11,638 million, compared with NIS 12,317 million a year earlier. IEC says the drop came mainly from lower sales to households, because customers moved to private suppliers.

Noga. Noga is the system operator. It dispatches the power plants, runs electricity trading, prepares demand forecasts and plans the transmission grid.

Private producers. According to the Electricity Authority, private producers held about 53% of the country's generating capacity in 2024, against only about 3% in 2012. This was the picture for gas-fired plants on 30 June 2025:

HolderGas-fired capacity (MW)
IEC4,406
Edeltech2,921
Dalia Energies2,518
Keystone2,322
Shikun & Binui2,060
Israel Corporation1,399
Generation Capital756

Total gas-fired capacity was 12,959 MW, and 66% of it was private. The Authority credits anyone holding more than 5% of a plant with that plant's full capacity, so the table adds up to more than the total. The concentration regulations that capped any single private player's share of gas-fired capacity expired at the end of 2024, and the Authority is drafting new ones.

Suppliers. Every consumer can now choose a supplier. In July 2024 customers with ordinary meters, not smart meters, were allowed in as well. In December 2025 the Electricity Authority wrote that about 350,000 customers had already moved to private suppliers. According to IEC's quarterly report, approved in August 2026, the number stood at about 447,000 as of its publication, including customers who moved on 1 July 2026.

Gas suppliers. According to the Electricity Authority, most of IEC's gas in 2024 came from the Tamar field. Leviathan and Karish also supply gas to the power sector.

Growth drivers

  • Demand: Noga prepares the demand forecast, and the Electricity Authority quotes it in its report. Under that forecast, generation will reach 94.6 TWh in 2030, against 80.4 TWh in 2024. According to Noga, peak demand set a new record of 17,245 MW, about 17.2 GW, in August 2025. The Electricity Authority noted that 2025 demand exceeded that year's forecast. According to Noga, the number of private electric cars rose from about 154,000 in 2024 to about 227,000 in 2025. The Electricity Authority also points to population growth and to industry switching to electricity.
  • Data centers: According to the Electricity Authority, the connections already committed to data centers total about 1.5 GW. If they are all built, they would account for about 10% of national consumption early in the next decade. The background is in our piece on the connection requests.
  • Renewables: In 2025 about 1,300 MW of new plants were connected to the grid, an average of 107 MW a month, against 82 MW a month in 2024. The Authority expects renewable capacity to reach about 16 GW by 2030 and to supply about 28% of generation.
  • Storage: In 2024 Israel had less than 600 MW of storage. The Authority expects more than 9,000 MW by 2030. The 344 MW pumped-storage plant at Kochav HaYarden was connected in February 2025.
  • Gas plants: The Authority projects that conventional capacity will reach 18.9 GW in 2030. The growth comes from new plants and from converting coal units to gas, about 8.4 GW in total. The projection assumes four new private combined-cycle plants.
  • More competition: In June 2026 the Authority proposed, for public hearing, an extra 2,000 MW quota for renewable plants in the bilateral market on the transmission grid. The same month it published a second competitive procedure, with a quota of up to 500 MW, in which virtual suppliers buy availability certificates from the system operator.

Challenges and risks

  • Gas dependence and supply security: In 2024, 72% of electricity was generated from natural gas. When Operation "Roaring Lion" began on 28 February 2026, the Ministry of Energy ordered the Leviathan and Karish fields to stop production, and Noga told IEC to run its coal units. Noga also describes a shutdown of gas supply during the "Rising Lion" war in 2025.
  • The grid and data centers: In July 2026 the Authority wrote that requests to connect about 19,000 MW of data centers had arrived within about two months. They came on top of 8,000 MW of requests already open. According to Noga, more connections could push gas use above the figure presented to the committee reviewing gas exports. The Authority also points to the possible effect on consumer tariffs.
  • Coal conversion: In August 2025 the Electricity Authority's chairman wrote to the energy minister about converting six IEC coal units to gas. He said IEC's updated cost estimate was about 200% of its earlier figure, and that the project was significantly delayed. The Environmental Protection Ministry pushed back the conversion deadlines for units 2-4 at the Rutenberg station. For units 1-4 at Orot Rabin, no longer intended for routine operation, Noga writes that keeping them as an emergency reserve is critical.
  • Tariff gaps: In a hearing dated 18 October 2026, the Authority calculated the gaps that had built up by the end of 2025. IEC had a cumulative tariff shortfall of NIS 608 million and Noga a surplus of NIS 753 million. Noga's surplus is outside its band. To even this out, the Authority proposes that during 2027 the system operator pay IEC an extra 1.72 agorot for every kWh its units feed into the grid.
  • Reliability: According to the Electricity Authority, outage minutes on the high-voltage network had been rising in recent years, but they fell in 2024. The Authority attributes the decline mainly to relatively mild weather and to IEC's investment in the distribution grid. The distribution development plan includes more than NIS 3 billion of investment to make supply more reliable.
  • Integrating renewables: To keep the grid stable, Noga limits output from extra-high-voltage solar plants during peak sun hours. In summer and in spring and autumn, peak demand for non-renewable generation comes in the evening, after sunset.

What to watch

  • 7 December 2026: The freeze on connection requests from data centers of 8 MW and above expires. On 18 October 2026 the Electricity Authority published, for public hearing, a proposed decision on new rules: a dedicated quota of up to 1,000 MW for data centers, a further quota of up to 300 MW for local needs, and a guarantee of NIS 2 million per MW requested. It is a proposal, not a decision. Will it be adopted in this form, and when?
  • 1 January 2027: The next half-yearly tariff update. Will the extra 1.72 agorot payment from Noga to IEC be approved in a final decision?
  • 2027: In its October 2026 hearing, the Authority proposed reviewing the generation and system tariffs during the year. Under Decision 72806, by 31 December 2028 it must decide the tariff structure from 2029 onward, including how to build the gaps accumulated at IEC and Noga into the tariff.
  • Orot Rabin conversion: According to IEC's June 2026 report, the Ministry of Energy asked that the conversion of unit 6 start as soon as unit 5 is finished, expected in March or April 2027. Will that timetable hold?
  • Faster switching: According to the Electricity Authority's switching guide, from 1 January 2027 the switching process for a customer with a smart meter will take up to three working days from the request, and the switch itself will take effect on the 1st of the following month.
  • Renewables target: The government target is 30% by 2030. The Electricity Authority notes that the target refers to the share of consumption, which was 16.7% in 2025.
  • Marginal price: The Authority put off to a later stage the move to a new half-hourly marginal price (MCP) and the pricing of emissions.

This article describes the situation and official data only. It is not investment advice and does not recommend any action.