In 2024 about 560 million cubic meters, 21% of Israel's water sources, came from seawater desalination plants, and another 23% came from treated wastewater, most of which goes to agriculture. Israel's water sector is a closed economy: according to the Water Authority, every increase in production and conveyance costs is passed back to the consumer through the tariff. Understanding how the water is produced, who carries it and who prices it is therefore also understanding what sits behind the water bill.
Errors or inaccuracies are possible. Spotted something that looks wrong? Write to me and I will correct it.
Why it matters
According to the Central Bureau of Statistics (CBS), Israel's water use in 2024 totaled 2.5 billion cubic meters. Agriculture used 52.1%, household, public and industrial consumption 46.3%, and 1.6% was returned to nature. The population consuming this water was estimated in September 2026 at about 10.305 million, having grown by 1.2% over the past year.
The sources themselves have changed fundamentally over the past two decades. This was the mix in 2024:
| Source | Volume in 2024 (million m3) | Share |
|---|---|---|
| Wells (groundwater) | 911 | 34% |
| Surface water, including the National Water Carrier | 585 | 22% |
| Seawater desalination | 560 | 21% |
| Treated wastewater | 596 | 23% |
Source: CBS, Israel in Figures on the eve of Rosh Hashanah 5787, September 2026.
The background is natural scarcity. Rainfall volume in the 2024/2025 rain year totaled 3.33 billion cubic meters according to the CBS, against a multi-year average of 6.13 billion. The level of the Sea of Galilee (Kinneret) stood in November 2025 at 213.4 meters below sea level, a drop of 2.1 meters in a year, and according to Mekorot data it stood at 213.73 meters below sea level on November 24, 2026.
In money terms: according to the State Comptroller, in 2022 the desalination plants supplied about 540 million cubic meters, about 30% of the fresh water supplied that year, worth NIS 1.5 billion. In its background document for the January 2026 tariff update, the Water Authority estimated the total cost of seawater desalination at about NIS 2.1 billion.
How the sector works
The chain has three layers: who produces the water, who conveys it at national scale, and who distributes it to homes.
| Link | Who | What flows through it |
|---|---|---|
| Production - desalination | Private operators under concession agreements (BOT/BOO) | Contracted capacity of about 596.4 million m3 in 2023, before Sorek 2 |
| Production - natural sources and effluent | Mekorot, private producers, wastewater treatment plants | Wells, the Kinneret, springs, and effluent from 111 licensed treatment plants in 2024 |
| National conveyance | Mekorot | About 1.87 billion m3 in 2024 |
| Municipal distribution | Water and sewage corporations and local authorities | Billing the consumer according to the tariff |
| Regulation and pricing | The Water Authority and its council | Setting quantities, recognized costs and tariffs |
Sources: State Comptroller (2024), Water Authority - Water Production Survey 2023-2024, Mekorot.
Desalination. According to the State Comptroller, the desalination plants were built under BOT and BOO models by private developers selected in tenders. The state signs a concession agreement with each operator and buys the water from it, and the Water Authority council approves each year the total quantity to be purchased. The water enters Mekorot's national system, and Mekorot is the one that actually pays the operators. According to the Water Authority's production survey, an operations committee at the Authority decides how much to produce at each plant, with economic cost as the main consideration. Desalinated water production capacity, including brackish water, stands at about 603 million cubic meters according to the survey.
The Kinneret and effluent. In 2024 about 556 million cubic meters were drawn from the Kinneret according to the Water Authority, including supply to Jordan, compared with 446 million in 2023. On the effluent side, the Shafdan plant in the Dan region produced about 25% of all of Israel's sewage in 2023 according to the survey, and its reclaimed water is conveyed through Mekorot's reclamation project, the Third Line to the Negev, for agricultural irrigation mainly in the western Negev.
The tariff. The Water Authority sets the recognized costs of suppliers and the consumer tariff. According to the tariff book as of January 1, 2026, the household tariff for the entitled quantity is NIS 8.51 per cubic meter including VAT and sewage, and NIS 15.62 above it. The entitled quantity per housing unit is no less than 7 cubic meters a month. In its background document for the January 2026 update, the Water Authority presented net added costs of about NIS 251 million, and accordingly proposed a 2.49% update in the household tariff. Among the components: about NIS 123 million for Sorek entering full operation and buying water from expansions, and about NIS 93 million for desalination purchases beyond the quantities approved in the tariff.
The players
Desalination plants. According to the State Comptroller, the contracted production capacity of the five large plants in 2023 was:
| Plant | Contracted capacity (million m3 a year) |
|---|---|
| Sorek 1 | 151.7 |
| Hadera | 137 |
| Ashkelon | 117.7 |
| Ashdod | 100 |
| Palmachim | 90 |
| Total | 596.4 |
Source: State Comptroller, Regulation and supervision of seawater desalination plants, 2024.
IDE Technologies built and operates several of the large plants. According to the company, Ashkelon started operating in 2005, Hadera in 2009 and Sorek in 2013 - all three under 25-year BOT agreements. According to IDE, Sorek alone accounts for about 20% of Israel's municipal water demand.
Sorek 2, also built by IDE, is according to the company Israel's largest plant, with annual output of 200 million cubic meters, and in March 2025 IDE reported that it is already supplying water. According to an IDE document, the agreement is a PPP/BOT for 25 years of operation, after which the plant is transferred to the state at no additional cost, and its water price (per the company's 2022 document) is NIS 1.45 per cubic meter. The plant has its own natural-gas power station with a capacity of 90 megawatts.
Mekorot. The national water company says it is responsible for supplying about 70% of Israel's water consumption and about 85% of household consumption, and its annual development budget ranges between NIS 1.5 and 2 billion. In 2024 its revenue totaled about NIS 5.36 billion, up about 2.2%, net profit about NIS 215 million and EBITDA about NIS 1.33 billion. That year it supplied about 1.87 billion cubic meters, of which about 208.6 million went to the Kingdom of Jordan and the Palestinian Authority.
The Water Authority. The regulator sets the quantities to be bought from desalination operators, the recognized costs of each supplier and the tariffs. The January 2026 update also included a reduction of about NIS 73 million from applying regulatory changes to Mekorot following the report of Prof. Eugene Kandel.
Water and sewage corporations. They are the link facing the household consumer. The Water Authority gives them incentives to reduce water loss, and in the January 2026 update it proposed setting the normative loss rate at 5%, because according to the Authority many corporations already run actual losses of up to 5%.
Growth drivers
Rising demand against a shrinking natural supply. Under the Water Authority's June 2023 forecast, as cited in the Comptroller's report, natural water supply is expected to fall from 1,278 million cubic meters in 2022 to 886 million in 2050, while demand for fresh water is expected to rise from 1,776 million cubic meters to 2,727 million.
New plants. Under the same plan, desalination capacity is set to grow from about 596 million cubic meters in 2022 to about 1,700 million in 2050. In the pipeline: Sorek 2 (200 million m3), Western Galilee (100 million m3, which as of the end of the audit was expected to start supplying water in 2026), the Ashkelon expansion (100 million m3) and a plant in Emek Hefer (200 million m3). According to the report, the Water Authority's planning division considered that the start of Emek Hefer could be postponed from 2030 to 2032.
Flowing north. Mekorot has completed the northward conveyance project to channel desalinated water into the Kinneret. According to the company, the goals are strengthening the Kinneret, boosting supply to northern communities and continuing to meet Israel's commitment to the Kingdom of Jordan.
Reuse and know-how abroad. In 2024 about 582 million cubic meters of effluent were produced at 111 licensed treatment plants according to the Water Authority, which describes Israel as the leader in using effluent for agriculture. Outside Israel, IDE reports a track record of more than 400 plants in 40 countries.
Challenges and risks
Geographic concentration on the coast. According to the State Comptroller, Hadera, Sorek 1 and Palmachim together supply about 62% of desalinated water, and with Sorek 2, next to Sorek 1, about 72%. Sorek 1, Sorek 2 and Palmachim are near the mouth of the Sorek stream, and Hadera is near the Hadera stream. According to Water Authority documents cited in the report, surplus effluent and raw sewage are discharged into these streams, and the Ministry of Health considers halting plants depending on sampling results.
Dependence on electricity. The Comptroller notes that several large desalination plants are among the largest electricity consumers in the economy, and were enrolled in a voluntary load-shedding arrangement with the system operator. In 2021 these plants supplied about 26% of Israel's fresh water, and when load is shed they stop producing. In an event in June 2023, load was shed at several large plants for six and a half to eight and a half hours at each plant.
Security and extreme events. According to the report, the Water Authority prepares for scenarios in which desalination plants are shut down by extreme weather, marine pollution, power outages or a security event, and the Comptroller pointed to the need for clear regulation of the issue.
Cost that passes to the consumer. Any desalinated water bought beyond the quantity approved in the tariff, and any new plant, enters the recognized cost and from there the tariff. The January 2026 update alone included about NIS 216 million in the two desalination components noted above. According to the production survey, in 2020 it was decided to moderate desalination output while increasing production from natural sources, and the decision on how much to produce at each plant rests mainly on cost.
Long contracts. According to the Comptroller, the concession agreements did not set in advance mechanisms for calculating an adjustment to the payment when the desalination administration orders changes to water-quality parameters and thresholds. The existing mechanism requires negotiation between the parties, and in a dispute an independent expert decides.
What to watch
- Western Galilee: Does the plant start supplying water during 2026, as the Water Authority expected at the time of the audit?
- Emek Hefer and the Ashkelon expansion: When will actual start dates be set, given the Water Authority's consideration of postponing Emek Hefer to 2032?
- The next tariff update: How much of the cost of additional desalinated water will enter the tariff, and how will the corporations be affected by the cut in normative loss, which under the proposal is completed in January 2027?
- Agricultural tariffs: From January 1, 2026, agricultural tariffs apply under Amendment 31 to the Water Law. The Water Authority estimated a decline in revenue from water for agriculture - how will the adjustment affect the mix between fresh water, effluent and brackish water?
- The Kinneret: The level fell over the past year. What is the actual volume flowing through the northward conveyance, and how much will be pumped from the Kinneret in 2025 and 2026?
- Load shedding: Will explicit rules be set between the Water Authority, the Electricity Authority and Noga on shutting down desalination plants at peak electricity hours?